Definition in SAREF4ENER v2.1.1 ontology document
s4ener:hasResumeCostEstimated — Resume cost estimated
- canonical IRI
- https://saref.etsi.org/saref4ener/v2.1.1/hasResumeCostEstimated
- label
- Resume cost estimated
- definition
-
In a power sequence the additional costs for the resumption of a device to its normal operation (after a pause).
Description as an Object Property
- has super-properties
- saref:hasPropertyValue